EasyManua.ls Logo

VEMAG ROBOT HP7E - First-time Maintenance Work

VEMAG ROBOT HP7E
182 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ROBOT HP7E / HP10E / HP12E / HP15E / HP20E8. Maintenance
8-6 © VEMAG 2010
8.3 First-time maintenance work
Perform the following maintenance work for the rst time after the inter-
vals given. After that, these measures should be effected in accordance
with the maintenance schedule.
Section 8.4
after 500 operating hours: Change hydraulic oil in the lifting and
tipping device (optional).
after 1000 operating hours: Change transmission oil of double screw
drive.

Table of Contents