Manual VIPA CPU 21x Chapter 5 Deployment CPU 21x-2BT02 with H1 / TCP/IP
HB103E - Rev. 05/45 5-23
• Activate the online functions in WinNCS via .
• Select "IP protocol" under
and type the new IP address.
• Establish a connection via
. Now you communicate via the IP
address given under CP-Init.
• The CP has to be in RUN. Ensure this via
. If the CP is in Idle-
Mode, the synchronization with the CPU has failed. Please control the
SYNCHRON block in OB 100.
• For control you may monitor the summary status of the TCP
connections via
.
Now the project engineering of the CPU and the CP is finished.
Control project
engineering