EasyManuals Logo

Wacker Neuson E3000 User Manual

Wacker Neuson E3000
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #49 background imageLoading...
Page #49 background image
wc_tx001951gb.fm
49
E 3000 Operation
4.11 Checking the HTF Level
When
Before leaving for the job site, or
Before beginning operation at the job site
Prerequisites
The machine is level.
The machine is cool.
Procedure
The Heat Transfer Fluid (HTF) level must be between the marks on the
sightglass (c).
If low
If the HTF level is low, HTF must be added. Filling the HTF reservoir requires
electric power to the machine and knowledge of the machine’s operation.
Familiarize yourself with the function of the machine’s controls, then see topic
Filling the HTF Reservoir for detailed instructions.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson E3000 and is the answer not in the manual?

Wacker Neuson E3000 Specifications

General IconGeneral
Electrical Requirements230 V, 50 Hz
Voltage230 V
Operating Voltage230 V
Heat Capacity3000 W
Fuel Consumption0.3 l/h
Tank Capacity12 l
Fuel Tank Capacity12 l
Heating Capacity3000 W
Fuel Consumption (l/h)0.3 l/h
Tank Capacity (l)12 l
Power Consumption3 kW

Related product manuals