EasyManuals Logo
Home>Wacker Neuson>Heater>E3000

Wacker Neuson E3000 User Manual

Wacker Neuson E3000
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #68 background imageLoading...
Page #68 background image
wc_tx001951gb.fm
68
Operation E 3000
4.26 Shutting Down and Packing Up the Machine
Shutting
down
Perform the procedure below to shut down the machine.
1. Turn off all accessories if applicable.
2. Rewind the hoses. See topic Rewinding the Hoses.
3. Move the burner ON-OFF switch (a) to the OFF position.
4. Move the pump ON-OFF switches (b
1
and b
2
) to the OFF position.
5. Move the circuit breaker ON-OFF switches (e) to the OFF position.
The machine is now shut down and ready to be packed up.
Packing up
the machine
Perform the following procedure to pack up the machine.
1. Disconnect and store all accessories.
2. Disconnect power from the machine.
3. Close and lock all doors.
Result
The machine is now ready to be stored.
wc_gr008536
a
b1 b2
LEFT
PUMP
RIGHT
PUMP
wc_gr008537
0
0
1
2
e

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson E3000 and is the answer not in the manual?

Wacker Neuson E3000 Specifications

General IconGeneral
BrandWacker Neuson
ModelE3000
CategoryHeater
LanguageEnglish

Related product manuals