EasyManua.ls Logo

Wacker Neuson E3000

Wacker Neuson E3000
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
wc_tx001951gb.fm
63
E 3000 Operation
4.22 Unwinding and Positioning the Hoses
Requirements
HTF preheated if applicable
HTF flow initiated
Procedure
Follow the procedure below to unwind and position the hoses.
1. Rotate the T-handle (a) counter-clockwise to unlock it.
:
2. Pull the hose (b) off the reel by hand and place it in the application area. See
topic Hose Spacing Guidelines for hose spacing recommendations based on
application.
Result
The hose is now positioned and the machine is operating.
NOTICE: The machine must be periodically monitored during operation to ensure
system efficiency. See topic Monitoring the Operating Parameters.
CAUTION
Burn hazard. The hoses and components of the plumbing system may be very hot.
Hot hoses and hot plumbing components may cause burns.
f Wear gloves when handling hot hoses and plumbing components.
wc_gr008535
wc_gr008530

Table of Contents

Related product manuals