BINNING 6–5
6.2.3 TWO TERM BIN TYPE
Two Term binning uses TERM1 and TERM2 measurements. TERM1 and TERM2 can be
different parameters. The TERM1 measurement uses a Low Limit (LL1) and a High Limit
(HL1) and the TERM2 measurement uses a Low Limit (LL2) and a High Limit (HL2).
Figure 6-7 One Term Dual Limits Bin Type diagram
Two Term binning can also be illustrated using the following diagram:
Figure 6-8 Two Term Bin Type two axis diagram
HL2 LL2
BIN3
BIN1
BIN2
LL1
HL1
TERM1
TERM2
BIN0 BIN4
HL2 LL2
BIN 3 BIN 0 BIN 4
BIN 1 BIN 2
USE TERM2
HL1 LL1
TERM1
TERM2
TERM1 magnitude
TERM2 magnitude