EasyManua.ls Logo

Wayne 4310 - Figure 6-9 Two Term bin Type Flow Chart

Wayne 4310
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BINNING
6–6
The following flow chart shows the decision process used to sort the DUT into bins:
ELSE
TERM2 > HL2
TERM2 < LL2
ELSE
TERM1 > HL1
TERM1 < LL1
Measurement
complete
TERM1 valueBIN1 BIN2
TERM2 valueBIN3 BIN4
BIN0
Figure 6-9 Two Term Bin Type flow chart
An example of Two Term binning:
Example: TERM1 measures Rs TERM2 measures Ls
TERM1 Low Limit (LL1) set to 0.9 TERM2 Low Limit (LL2) set to 4.23µH
TERM1 High Limit (HL1) set to 1.1 TERM2 High Limit (HL2) set to 5.17µH
TERM1 value TERM2 value BIN PASS/FAIL
<0.9 ANY 1 FAIL
<4.23µH 3 FAIL
Between 4.23µH & 5.17µH 0 PASS
Between 0.9 & 1.1
>5.17µH 4 FAIL
>1.1 ANY 2 FAIL

Table of Contents