PergoTex II/ PergoTex II LED
Instructions for assembly
We reserve the right to make technical changes
Left guttering section:
1. Elevate the right part of the guttering to
the necessary height using e.g. an
adjustable trestle.
2. Screw the centre / wall post (2) to the
right guttering (1) from below with the
countersunk hex head screw M8 x 40
(2).
3. Apply a suitable adhesive/ jointing
compound to the exposed area of the
guttering coupling and the exposed
side of the gutter connector.
4. Slide the left guttering on.
5. Press the guttering together.
6. Screw the left guttering to the post from
below with the countersunk hex head
screw M8 x 40 (3).
7. Press the guttering together.
8. Pull the left and right guttering together
with bracings (4).
9. Tighten the two countersunk hex head
screws M8 x 40 (3) from below.
Note:
Secure the guttering and post against
falling until the side channels have been
mounted.