EasyManua.ls Logo

YASKAWA DX200 - Page 179

YASKAWA DX200
1166 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11 LED Indicator on Circuit Board
11.3 7 SEG-LED Indicator
11-5
11.3.0.1 7 SEG-LED Indicator Status (1-digit indication) of Each Unit at Error Occurrence
YIF01
All Lit The power has been turned ON.
0 The booting program has started.
1 The system program has started. (Starts up initialization of various kinds.)
2 Starts verifying the existence of other circuit boards. (Verifies the start-up of the booting program.)
3 Starts the system program transmission.
4 Sends the request of the system program start-up.
5 Starts verifying the existence of other circuit boards. (Verifies the start-up of the system program.)
6 Acquires hardware information, etc. of other circuit boards. (Verifies the IO board status, servo IF,
and so on.)
7 Starts the CMOS data transmission.
8 Sends the pre-online request.
9 Waits for CERF communication synchronization.
A
B Sends the start-up request of on-line system.
C The on-line system has started. (Starts up the initialization task.)
D Processes the DX200 setup completion. (Servo ON enabled)
E Alarm occurs at the DX200 setup.
F The maintenance system is starting up.
P Communications interrupted between NCP01 and the programming pendant.
U Updating system software through network.
YCP02
All Lit The power has been turned ON.
0 The booting program has started. (ROM/RAM/FP register check)
1 Starts the booting system. (Completes initialization of various kinds.)
2 Completes the preparation for receiving the system program.
3 The system program has been received. (Waits for the request of system change.)
4 The system program has started. (Starts up hardware initialization of various kinds.)
5 Starts the system. (Completes initialization of various kinds.)
6 Starts the CMOS data transmission.
7 Receives the CMOS mapping. (Waits for pre-online)
8 Starts the optional system. (Starts the process of various initialization.)
9
A
B
C
D Completes the DX200 setup process.

Table of Contents

Other manuals for YASKAWA DX200

Related product manuals