713D SYSTEMS, INC.
8. Remove overows and clean the inside of the overows using
paper towels with IPA.
9. Unfasten the 4 bolts on top of the overow and then remove the
lid to clean out the inside.
10. Replace bolts when nished.
11. When all areas have been thoroughly cleaned, install clean
module and ll with new powder.
MATERIAL CHANGE BY CHANGING BUILD MODULES
This procedure is to be followed if you have a second build module containing a different material.
1. Remove Build Module 1 from the build chamber.
2. Clean the interior of the build chamber as described in the previous procedure.
3. Install Build Module 2.
7. Home the axis of Build Module 2.
8. Begin your next build.
9. Place a cover over Build Module 1 to protect the material from dust and any other contaminents.
10. If Build Module 1 is to remain unused for an extended period of time, (over one week), remove all of the material from Build Module
1 as described the the previous procedure. Store the material as described in the section, “Material Safety”, in this document.