IntervalEquipmentMaintenance activity
First change when DTC
iii
reads:
6,000 hours
Second change when DTC
iii
reads:
24,000 hours
Following changes:
Every 24,000 hours.
Oil in axis-3 gearboxChange
No change needed.Oil in axis-4 gearboxChange
First change when DTC
iii
reads:
6,000 hours
Second change when DTC
iii
reads:
24,000 hours
Following changes:
Every 24,000 hours.
Oil in axis-5-6 gearboxChange
Every:
40,000 hours .
RobotOverhaul
36 months or battery low alert
iv
Battery pack, measurement
system of type RMU101 or
RMU102 (3-pole battery con-
tact)
Replacement
Battery low alert
v
Battery pack, measurement
system with 2-pole battery
contact, e.g. DSQC633A
Replacement
i
Replace when damage or cracks is detected or life limit is approaching that specified in section
Expected component life on page 113.
ii
Check more often if the environment is very contaminated.
iii
DTC = Duty Time Counter. Shows the operational time of the robot.
iv
The battery low alert (38213 Battery charge low) is displayed when the battery needs to be replaced.
The recommendation to avoid an unsynchronized robot is to keep the power to the controller turned
on until the battery is to be replaced.
See the replacement instruction for more details.
v
The battery low alert (38213 Battery charge low) is displayed when remaining backup capacity
(robot powered off) is less than 2 months. The typical lifetime of a new battery is 36 months if the
robot is powered off 2 days/week or 18 months if the robot is powered off 16 h/day. The lifetime
can be extended with a battery shutdown service routine. See Operating manual - IRC5 with
FlexPendant for instructions.
Activities and intervals, optional equipment
The table below specifies the required maintenance activities and intervals for
common optional equipment. The maintenance of other external equipment for the
robot is detailed in separate documentation.
NoteIntervalEquipmentMaintenance activity
Every:Signal lampInspection
12 months
Every:Additional mechanical
stop, axis 1
Inspection
12 months
Inspect the fan for contam-
ination that could hinder
the air supply. Clean if ne-
cessary.
Every 12
months
Motor fanInspection
112 3HAC033453-001 Revision: H
© Copyright 2009-2013 ABB. All rights reserved.
3 Maintenance
3.2.2 Maintenance schedule