EasyManua.ls Logo

ABB IRB 4600 - 60/2.05 - Page 282

ABB IRB 4600 - 60/2.05
374 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
How to drain the gearbox is described
in section:
Changing the oil, axis-2 gearbox
on page 162
Axis-2 motor:
The gearbox has to be drained before
removing the motor.
2
How to drain the gearbox is described
in section:
Changing the oil, axis-3 gearbox
on page 166
Axis-3 motor:
The gearbox has to be drained before
removing the motor.
3
-Axis-4, axis-5 and axis-6 motors:
Draining of gearbox oil is not needed if
robot is positioned as recommended.
4
Removing motors
Use this procedure to remove the axis-1, axis-2, axis-3, axis-4, axis-5 and axis-6
motors.
Note
The procedure contains information how to remove motors on all axes of the
robot. Some steps are only applicable to a certain motor. Follow the steps
carefully in order not to miss vital information!
NoteAction
See:
Position of robot on page 281
Move the robot to the recommended position
for the motor that shall be removed.
1
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot working
area.
2
See:
Draining gearbox on page 281
Check if the gearbox needs to be drained.3
Continues on next page
282 3HAC033453-001 Revision: H
© Copyright 2009-2013 ABB. All rights reserved.
4 Repair
4.7.1 Removing motors
Continued

Table of Contents

Related product manuals