EasyManua.ls Logo

ABB IRB 6640 - Page 307

ABB IRB 6640
440 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Repair
4.5.4. Replacement of balancing device (design 1)
3053HAC026876-001 Revision: F
© Copyright 2007-2010 ABB. All rights reserved.
15. Lock the cradle bearings
using the retaining ring,
bore (A).
xx0900000089
16. Mount new VK- covers on
both sides.
17. Raise the balancing device
to a position where the
shafts may be refitted.
18. Lubricate the shaft with
grease.
40ml
19. Refit the front shaft using
the tool 3HAC028920-001.
20. Refit the attachment screw
securing the shaft.
Attachment screw M16x70 quality 12.9 Gleitmo
Tightening torque:300 Nm
21. Refit the retaining ring,
bore.
22. Refit the VK cover.
23. Lubricate the bearing in
the ear with grease
through the lubricating
nipple, with a grease
pump.
Fill until excessive grease
pierces between the shaft
and the sealing spacer.
20ml
24. For Clean Room robots -
refit the lower end of the
cable harness.
Detailed in section Replacement of cable harness,
Cleanroom on page 224.
25. Restore the balancing
device.
Method 1: described in section Restoring the balancing
device using a hydraulic press tool. on page 325
Method 2: described in section Restoring the balancing
device using distance tool on page 320
Action Note
Continued

Table of Contents

Related product manuals