EasyManua.ls Logo

ABB IRB 6640 - Replacement of Cabling, Axis 5 Motor

ABB IRB 6640
440 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Repair
4.3.2. Replacement of cabling, axis 5 motor
3HAC026876-001 Revision: F214
© Copyright 2007-2010 ABB. All rights reserved.
4.3.2. Replacement of cabling, axis 5 motor
Location of cabling
The separate cables for the axis 5 motor are located inside the upper arm tube, as shown in
the figure below.
xx0500002294
Required equipment
Removal, cabling axis 5 motor
The procedure below details how to remove the cabling from the axis 5 motor.
A Motor axis 5 with connectors R4.FB5 and R4.MP5
B Connectors R3.FB5 and R3.MP5
Equipment Spare part no. Note
Cable harness axis 5 See Spare parts
chapter.
Circuit diagram 3HAC025744-001
Standard toolkit The content is defined in the section
Standard toolkit on page 409.
Other tools and procedures may
be required. See references to
these procedures in the step-by-
step instructions below.
These procedures include
references to the tools required.
Action Note
1.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots:
Do not turn off the air pressure to motors and
SMB.
Continues on next page

Table of Contents

Related product manuals