EasyManua.ls Logo

ABB IRB 930 - Page 360

ABB IRB 930
606 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removing the cable arm
Use these procedures to remove the cable arm.
Preparations before removing the cable arm
Remove the robot from the wall or enough space.
NoteAction
Decide which calibration routine to use, and take
actions accordingly prior to beginning the repair
procedure.
1
If there is no enough space for the maintenance
work, remove the robot from the wall and place it
on the maintenance bracket.
CAUTION
Do not lay down the robot during the transporta-
tion, always keep it straight.
If the robot lay down in any situation, the grease
may come out from gearbox.
2
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the safeguarded
space.
3
Removing the process hub screws
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
For robots with protection class
IP30
Remove the screws locking the process hub.2
xx2300000487
Push the process hub to the outer arm.3
Continues on next page
360 Product manual - IRB 930
3HAC086009-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.6.7 Replacing the cable arm
Continued

Table of Contents

Other manuals for ABB IRB 930

Related product manuals