EasyManua.ls Logo

ABB IRB 930 - Page 443

ABB IRB 930
606 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removing the axis-2 motor sub-assembly
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
xx2300000605
Remove the screws and washers.2
Remove the motor.
Tip
Move the internal harness out of the way.
3
Refitting the axis-2 motor sub-assembly
Use these procedures to refit the axis-2 motor sub-assembly.
Refitting the axis-2 motor sub-assembly
NoteAction
Replace the o-ring if needed.1
Screws: Hex socket head cap
screw M6x20 12.9 Gleitmo
603+Geomet 500 (4 pcs)
Refit the motor.2
Refit the screws and washers.3
Washers: Spring washer, conical
11x5.3x1.2 Steel (4 pcs)
Tightening torque: 2.3 Nm ±10%
xx2300000605
Continues on next page
Product manual - IRB 930 443
3HAC086009-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.7.2 Replacing the axis-2 motor sub-assembly
Continued

Table of Contents

Other manuals for ABB IRB 930

Related product manuals