EasyManua.ls Logo

ABB OmniCore V250XT - Page 130

ABB OmniCore V250XT
456 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Note/IllustrationAction
For the robot signal exchange proxy:
K2.X8 - A2.X6
(option): K2.X2 - K4.X8, A2.X1
K2.X12 - A2.K3.X6, A2.K3.X7
K2.X10 - A1.X13
K2.X21 - TempSensor
K2.X4 - A1.X9
K2.X3 - K6.X1, A2.K3.X1, K5.1.X4,
K7.X1
K2.X1 - T2.X2
K2.X17 - G2.X1, G1.X2
K2.X6, K2.X11 - A1.X2
K2.X7, K2.X22 - Harn. LV robot
power
K2.X9 & X13 - FlexPendant
For the Ethernet extension switch (op-
tion):
K2.X2 - K4.X8, A2.X1
K4.X7 - K5.1.X5
K4.X6 - A2.X4
For the connected services gateway:
K7.X1 - K2.X3
i
K7.X2 - A2.X5
Note
The connector K7.X2 is locked; grab the
connector, push it in to release it and
then remove the connector.
For the main computer:
K2.X8 - A2.X6
K2.X2 - K4.X8, A2.X1
K2.X12 - A2.K3.X6, A2.K3.X7
K6.X2 - A2.X9
A2.X5 - K7.X2
A2.X4 - K4.X6/K5.1.X5
Note
If the Ethernet extension switch is
installed, connect and disconnect
the connector A2.X4 to/from
K4.X6.
If the Ethernet extension switch is
not installed, connect and discon-
nect the connector A2.X4 to/from
K5.1.X5.
Continues on next page
130 Product manual - OmniCore V250XT
3HAC073447-001 Revision: B
© Copyright 2020-2022 ABB. All rights reserved.
3 Installation and commissioning
3.7.5 Installing the fieldbus master
Continued

Table of Contents

Related product manuals