EasyManua.ls Logo

ABB OmniCore V250XT - Page 236

ABB OmniCore V250XT
456 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Note/IllustrationAction
Opening the door on page 176.Open the door.2
Location of wrist strap button:
ELECTROSTATIC DISCHARGE
(ESD)
The unit is sensitive to ESD. Before
handling the unit read the safety inform-
ation in section The unit is sensitive to
ESD on page 43.
3
xx2100000318
Disconnecting the connectors to the main computer assembly
Note/IllustrationAction
Disconnect all the connectors on the as-
sembly group of the robot signal ex-
change proxy, Ethernet switch (option),
connected services gateway, scalable
I/O (option), and main computer.
1
For the robot signal exchange proxy:
K2.X8 - A2.X6
(option): K2.X2 - K4.X8, A2.X1
K2.X12 - A2.K3.X6, A2.K3.X7
K2.X10 - A1.X13
K2.X21 - TempSensor (G3.TEMP)
K2.X4 - A1.X9
K2.X3 - A2.K3.X1, K7.X1
(option 3032-1): K2.X3 - K5.1.X4
(option 3037-1): K2.X3 - K3.1.X4
K2.X1 - A1.X6
K2.X17 - G1.X1, G2.X1, G3.X1,
G4.X1, G5.X1
- A1.X2
K2.X11 - A1.X2
K2.X7, K2.X22 - Harn. LV robot
power (X1)
K2.X9 & X13 - FlexPendant (X4)
For the Ethernet extension switch:
K2.X2 - K4.X8, A2.X1
K4.X7 - K5.1.X5
K4.X6 - A2.X4
Continues on next page
236 Product manual - OmniCore V250XT
3HAC073447-001 Revision: B
© Copyright 2020-2022 ABB. All rights reserved.
5 Repair
5.2.8 Replacing the main computer
Continued

Table of Contents

Related product manuals