100 Operating instruction SCK Gas Sampling System OI/SCK-EN Rev. E
Installing the control cabinet
Risk of injury in the area of the gas sampling system due to moving or fall-
ing parts, hot surfaces, anti-freeze, compressed air, lubricating oil
Wear general personal protective equipment:
Closed overalls with long trousers and long sleeves
Safety shoes
Safety gloves suitable for mechanical work
Safety glasses
Protective helmet
If necessary, additional protective equipment if prescribed by the opera-
tor.
Danger of crushing when lifting or lowering the transport unit
Only appropriately trained personnel may transport the transport units and
only with the aid of the recommended transport equipment.
Do not stand under suspended loads.
Follow the transport instructions in these operating instructions care-
fully.
4 galvanized steel screws (or stainless material) M10 or bolts M10
The following requirements must be met in order to install the control cabi-
net:
The site conforms to the designated site conditions (criteria see
Choosing
the place of installation of the peripheral modules
).
Fastening points are present to affix the control cabinet.
The control cabinet is unpacked.
How to install the control cabinet:
Step Procedure
1
Fasten control cabinet in suitable position (see
Choos-
ing the place of installation of the control cabinet
) with 4
assembly screws or bolts.
Mechanical, thermal
and material dangers
units
assembly