176 Operating instruction SCK Gas Sampling System OI/SCK-EN Rev. E
Gas sampling probe H: Removing incrustations
daily (or as required)
Always take the following safety measures when performing this work:
Wear a face mask against heat, heat-proof gloves and protective weld-
er's clothing.
Turn the service switch to
ON
and secure the service switch against un-
authorized switching (with a padlock).
Additionally press the EMERGENCY STOP switch.
Do not enter the danger area around the retractor until it is at standstill
and the warning lamps and buzzer are off and the shutter is closed.
Do not perform the work until the gas sampling system has cooled
down.
Lock the shutter when you start the work, unlock the shutter after fin-
ishing the work.
Always keep the floor around the gas sampling system clean and dry.
Explanation of safety measures:
Safety regulations for maintenance work on
page 158.
Chisel
Hammer
Maintenance interval
measures