EasyManuals Logo

ABB SCK User Manual

ABB SCK
244 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #105 background imageLoading...
Page #105 background image
OI/SCK
-EN Rev. E Operating instruction SCK Gas Sampling System 105
Connecting the sample gas line to the retractor
Risk of injury in the area of the gas sampling system due to moving or fall-
ing parts, hot surfaces, anti-freeze, compressed air, lubricating oil
Wear general personal protective equipment:
Closed overalls with long trousers and long sleeves
Safety shoes
Safety gloves suitable for mechanical work
Safety glasses
Protective helmet
If necessary, additional protective equipment if prescribed by the opera-
tor.
Pneumatic/hydraulic interface plan
How to connect the sample gas line to the analyzer system:
Step Procedure
1
The connector from the sample gas line to the probe
retractor cable drag chain can be found in the pneumat-
ic/hydraulic interface plan in the appendix. If further
information is required on installation and connection to
the analyzer system, consult the operating instructions
of the analyzer system and analysis line.
Note: These tasks apply only to connection of the sam-
ple gas line to the analyzer system. The internal retractor
sample gas line is delivered pre-installed.
Observe the following rules:
Install sample gas line separately from other lines.
When laying the sample gas line, avoid tight curves, bending or crossing
other lines.
Refer to the manufacturer's installation instructions for further details.
Mechanical, thermal
and material dangers
Required documents
Instructions
Installation of the
line

Table of Contents

Other manuals for ABB SCK

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB SCK and is the answer not in the manual?

ABB SCK Specifications

General IconGeneral
BrandABB
ModelSCK
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals