-EN Rev. E Operating instruction SCK Gas Sampling System 227
The following conditions must be met:
The system is switched off at the main switch.
Central compressed-air supply shut off, gate valve in pneumatic box closed
(compressed-air pipes are vented).
Rotary kiln is shut down.
The system has cooled down.
Perform the following steps to shut down the system:
Secure the closed shutter on the duct flange with the enclosed
locking device.
Unscrew sample gas line screw connection on the analyzer
cabinet and gas sampling probe.
Flush sample gas line, filter unit and sample gas probe with dry,
dust-free and oil-free instrument air (flow rate approx. 100 l/h)
Clean any residue and incrustations off the filter unit and probe
pipe.
Note: Only clean mechanically. Do not use chemicals (particu-
larly acids and lyes) for cleaning.
Shutting down