242 Operating instruction SCK Gas Sampling System OI/SCK-EN Rev. E
L
Lubricating oil • 116
M
Maintenance • 149
Maintenance mode • 161
Maintenance plan • 150
Minimum compressed-air requirements • 33
Mode of functioning and operating modes • 19
Modes • 19
Monitoring automatic mode • 139
N
Nameplate • 10
O
Operating parameters
Basic parameters • 48, 51
Limit parameters • 48, 51
Time parameters • 48, 51
Operating the service switch • 161
Operation • 135
Optimizing operating parameters • 51
Overview
installation • 94
Start-up • 112
Overview of dangers • 57
P
Personal safety equipment • 67
Pneumatic system
Replacing the compressed-air filter • 213
Pneumatic/hydraulic interface plan • 236
Preparing the compressed-air supply • 116
Preparing the cooling-water circuit • 114
Probe retractor • 24
Checking and replacing the filter muffler • 193
Checking and tightening the drive chain • 198
Checking and topping up the oiler • 195
Checking and, if necessary, adjusting the
position indicator (probe end position) •
204
Checking and, if necessary, adjusting the
position of the probe • 200
Checking filter/pressure control combination •
191
Checking the bellows • 207
Process monitoring • 20
Protective installations • 59
Putting back into operation • 233
Putting the system back into operation • 233
R
Requirements to be met by personnel, work
places • 65
S
Safety • 53
Safety instructions in this document • 8
Safety measures
Installation • 69
Maintenance and troubleshooting • 80
Operation • 76
Start-up • 72
Transport and unpacking • 68
Safety regulations for maintenance work • 158
Safety regulations for operation • 136
Scope of delivery • 92
Service • 13
Shutting down the system • 226
Shutting down, storing, putting back into
operation, disposal • 225
Starting frequency converter and adapting control
parameters • 124
Start-up • 111
Storing the system • 232
Structure and function • 18
Structure and function of the control system • 36
System identification • 10
T
Technical data • 16
Tolerance ranges, tolerances • 48
Touchpanel • 22, 35, 36, 47
Touchscreen error displays • 218
Transformer • 32
Transformer connection plan • 240
Transport and unpacking • 85