EasyManua.ls Logo

ActronAir ELY620T - Unit Preparation; Outdoor Unit - Interconnecting Pipes Installation

ActronAir ELY620T
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
Installation and Commissioning Guide 500-700 Tri-Capacity Split Ducted
Doc. No.0525-098 Ver. 2 210330
Installation and Commissioning Guide
Split Tri-Capacity
13. UNIT PREPARATION
13.01. Outdoor Unit - Interconnecting Pipes Installation
A
B
Removal Order:
Pull-Out
Pull-Down to remove
Access Panel-Electrical
A
B
B
1. Remove Access Panel-Electrical
Remove mounting screws (4 pcs).
Remove Access Panel-Electrical as shown in the above
illustration.
2. Remove Access Panel-Compressor
Remove mounting screws (4 pcs).
Remove Access Panel-Compressor as shown in the above
illustration.
3. Remove Access Panel-Piping
Remove mounting screws (6 pcs).
Remove Access Panel-Piping as shown in the above illustration.
Remove all Foil Faced PE protection from pipes.
4. Install Interconnecting Pipes
Solder refrigeration piping. Refer to piping sections for
details of field pipe sizes and piping installation procedure.

Table of Contents

Related product manuals