75
3. Task setting
Refer to the task setting in paragraph 6.1.1.
4. Start the task
Refer to “Start the task” in paragraph 6.1.1.
The calibrator will automatically use the measured value of the voltage measurement, current measurement, or
the HART measurement according to the DUT output type set by the user, without manual input.
5. Finish the task
Refer to Finish the task in paragraph 6.1.1.
6.1.3 Pressure switch
1. Connect to DUT
Connect the external pressure module to the LEMO port A or B. connect the DUT output with calibrator’s electric
module as shown in Figure 7.
2. Create the task
Create the corresponding DUT tasks as described above, and fill out the necessary information, as shown below.