EasyManuals Logo

Agilent Technologies E5071C ENA User Manual

Agilent Technologies E5071C ENA
312 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #31 background imageLoading...
Page #31 background image
Chapter 1 31
General Information
Power Meter Accuracy Test
1. General Information
Step 17. Record the DVM voltage reading as value D in the test record.
Step 18. Wait for the power meter reading to settle (no settling drift within 20 seconds).
Step 19. Record the power meter reading as value E in the test record.
Step 20. If testing a dual-channel power meter, perform Step 7 through Step 19 for the other
channel.
Step 21. Perform the pass/fail calculations indicated on the test record.
NOTE If a channel of the power meter does not pass this test, the power meter cannot be used in
applications that require Option G12 or H12. There are no adjustments that can be
performed to improve the performance of the power meter. Typically, replacing the A6
measurement assembly associated with the failed channel will correct the problem.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies E5071C ENA and is the answer not in the manual?

Agilent Technologies E5071C ENA Specifications

General IconGeneral
BrandAgilent Technologies
ModelE5071C ENA
CategoryNetwork Accessory
LanguageEnglish