EasyManuals Logo

Avaya S8500 User Manual

Avaya S8500
1262 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #245 background imageLoading...
Page #245 background image
Post-Upgrade tasks
Issue 2.1 June 2006 245
Enabling scheduled maintenance with SAT
To enable scheduled maintenance.
1. Type change system-parameters maintenance and press Enter.
2. Ensure that the administration for the Start Time and Stop Time fields is the same as
before the upgrade.
Releasing MMI circuit packs in duplicated control network using
SAT,
(main server only)
Type release board UUCSS and press Enter to release the circuit packs that you busied out
earlier. For more information, see Busying out MMI circuit packs with SAT for a duplicated
control network only (main server only) on page 212 section.
Busying out previously busied out trunks
If you recorded any busyouts earlier on the main server only, you need to ensure that they also
are busied out after the conversion.
Checking for translation corruption with SAT (main server only)
To check for translation corruption:
1. Type newterm and press Enter.
2. If you see the following message:
Warning: Translation corruption detected
then follow the normal escalation procedure for translation corruption before you continue
the upgrade.

Table of Contents

Other manuals for Avaya S8500

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Avaya S8500 and is the answer not in the manual?

Avaya S8500 Specifications

General IconGeneral
BrandAvaya
ModelS8500
CategoryServer
LanguageEnglish

Related product manuals