5 Commissioning
5.1 Delivery state
PC-Card slot: no PC-Card inserted
Program protection switch: programming enabled (switch position: "Set
Enable")
Supply voltage: as per order (see Capture “Supply voltage se-
lection”, Page 44)
5.2 Preparation for commissioning
1. Check the DLX unit for transport damages.
Should there be any damages caused by transport, please contact us.
2. Check that your DLX unit was delivered as per your order.
3. Read this user manual carefully before starting the commissioning.
4. Prepare all electrical connections according to the section “Terminals” (starting
from page 45) or according to the accompanying special terminal connection
plan.
If a special terminal connection plan is present, the sectionTerminals
is invalid!
5. Install the DLX at the designated measurement location.
6. Connect the DLX to the mains supply voltage.
The DLX will start immediately with its operation, based on the factory settings
as per section “Factory settings(see page 95).
7. Modify the measurement parameters and device parameters with the software
application "DLXPARA", if required.