EasyManua.ls Logo

Baumuller BM4400 - Recommissioning

Baumuller BM4400
360 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Recommissioning
Instruction handbook b maXX BM4400, BM4600, BM4700
Document No.: 5.12008.07 Baumüller Nürnberg GmbH
316
of 358
12.6
12.6 Recommissioning
Execute commissioning as with a new device, see
ZMountingfrom page 143, ZInstallationfrom page 163.
.
CAUTION!
Recommissioning without forming of the capacitors.
From six months storage period on, the capacitors are destroyed during commission-
ing, if they are not formed beforehand
m Reform the DC link capacitors:
n by supplying the device ready-to-operate for at least one hour with
supply voltage
n but do not transmit a pulse enable during this time.
m Consider, that it is imperative, to connect the accordingly prescribed line commu-
tating reactor for this forming procedure. Devices, where no line commutating re-
actor is necessary can directly be supplied with mains voltage.

Table of Contents

Related product manuals