S12 Vet Monitor User’s Manual
23-3
60601-1 module.
2. Or after the monitor falls.
3. At least once every two years or as required.
Other Tests
Power-on test Before use.
Network print test 1. During the first installation.
2. After repairing or replacing the printer.
Recorder check 1. Before the first use.
2. After repairing or replacing the recorder.
Battery
check
Functionality test
1. During the first installation.
2. After replacing the battery
Performance test
Every two months or when the running time of
the battery is significantly shortened.
23.3. Disposing of the Monitor
After the equipment reaches its service life, please dispose of the monitor and its
accessories according to local regulations.
WARNING:
For the disposal of parts and accessories, if there is no corresponding
regulation, local regulations on disposal of hospital waste can be followed.