EasyManua.ls Logo

biosystems A15 - LIST OF REQUIRED TOOLS; SOFTWARE VERSIONS; Service and User Program Version History

biosystems A15
131 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service manual
128
A IV. LIST OF REQUIRED TOOLS
1. Set of metric Allen keys.
2. Loctite 243 screwfastener or similar
3. Mechanical grease ELESA NT1 (for ceramic pump only) (AC13079).
4. Heat silicone or similar
5. Soldering iron
6. Screwdrivers or two 3 mm Allen keys.
7. Loctite 245 or similar (for ceramic pump only).
8. Temperature adjustment tool (AC11860).
9. XYZ adjustment tool (AC15000)
A V. SOFTWARE VERSIONS
Change in the versions of service program
Date version Change
04/04/06 3.0.1 First release version
20/07/06 3.0.2 Correction of errors
Improve the checking before load a new rmware
18/12/06 3.1.0 Modify the level sensitivity adjustment screen to incorporate the in-
dependent adjustment by type of rack.
Added the help menu with the preventive maintenance guide.
13/12/07 3.2.0 Improve the ne zmax adjustment. Include a new menu to change
the rotor type.
22/01/09 4.0.0 Improve the adjustment position of the racks and reagents racks.
17/07/09 4.1 Modify the adjustment menu to include an option to select the type
of racks: metal rack or plastic racks.
Included a new menu to use the photometry tool.
Temperature adjustment tool

Table of Contents