EasyManua.ls Logo

Braun SpaceStation - Page 67

Braun SpaceStation
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Disassembly / Assembly SpaceStation
3
SpaceStation, 1.0 gb 3- 25
1.0
Check List for Checks after Repair
Visual Inspection Electrical Safety
according to IEC / EN 60601-1
or VDE 0750 and VDE 0751
Functional Inspection
❒ Cleanliness
❒ Completeness
❒ Damage and faults affecting safety
❒ Damage to and readability of the label
❒ Cover caps
❒ Connectors
❒ Well running and sealing of the module
lock
❒ Mains cable
❒ Accessories
❒ Mains voltage according to the TSC
❒ Protective conductor resistance ac-
cording to the TSC
❒ Earth leakage current according to the
TSC
❒ Locking with second SPS
❒ Pump locking of all slots
Connect unit to mains.
General functional check with SpaceCover
comfort and pump of every slot.
❒ Voltage supply of all slots
❒ Alarm transmission
❒ Staff call transmission

Table of Contents