EasyManua.ls Logo

Braun SpaceStation - Checks After Repair

Braun SpaceStation
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Disassembly / Assembly SpaceStation
3
3- 24 SpaceStation, 1.0 gb
1.0
Housing Back Panel
1. Insert the housing back panel on the notches at the two con-
nector coverings into the housing and rotate the back panel
in its final position.
2. No screw is inserted in the third mounting hole (from the top)
on the right-hand side of the back panel. The hole must be
covered with a cover cap.
3.11 Checks after Repair
1. Check the device to ensure safe functionality of the unit (see
„Device Check“ S. 2 - 4).
2. Depending on the work carried out the specific steps of the
TSC must be performed (see „Technical Safety Check (TSC)“
S. 7 - 1).
3. The activities carried out must be recorded in the following
check list.
Abb.: 3 - 27
Legende zu Abb. 3 - 27:
ItemDesignation
1 Housing notch
2 Empty mounting hole
2
1

Table of Contents

Related product manuals