Disassembly / Assembly SpaceCom
4
SpaceStation, 2.0 gb 4- 15
2.0
Check List for Checks after Repair
Visual Inspection Electrical Safety
according to IEC / EN 60601-1
or VDE 0750 and VDE 0751
Functional Inspection
❒ Cleanliness
❒ Completeness
❒ Damage and faults affecting safety
❒ Damage to and readability of the label
❒ Cover caps
❒ Connectors
❒ Well running and sealing of the module
lock
❒ Mains cable
❒ Accessories
❒ Mains voltage according to the TSC
❒ Protective conductor resistance ac-
cording to the TSC
❒ Earth leakage current according to the
TSC
❒ Housing leakage current SPCO accord-
ing to the TSC
❒ Locking with second SPS
❒ Pump locking of all slots
Connect unit to mains.
General functional check with SpaceCover
comfort and pump of every slot.
❒ Fan SPCO (approx. 1 sec.)
❒ Status indicator (green) lights up
❒ Alarm indicator (red) is on for
approx. 1 min.
❒ Voltage supply of all slots
❒ Alarm transmission
❒ Staff call transmission
❒ Ethernet interface (RJ 45)
❒ RS232 interface
❒ Charge state of the battery module
(display on the SpaceCover comfort)
❒ Switch-over mains / battery