EasyManua.ls Logo

BWT Perla - 8 Start-up; Installation Check 1;4: Waste Water Connection; Installation Check 2;4: Connection Fitting Ports; Installation Check 3;4: AQA Stop Sensor

BWT Perla
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
EN
Installation check 1/4: Waste water connection
according to EN1717
Check that the waste water hoses are connected
properly (see chapter -
18).

Press
INSTALLED
.
Installation check 2/4: Ports on the connection
tting
  
-
nected (see chapter 
page 17).
Open the connection fitting by turning the
handwheel anti-clockwise until it stops. Rinsing
of the product starts.

Press
INSTALLED
.
Installation check 3/4: AQA Stop Sensor
      
sensor (see chapter   
page 17).

Press
CONFIRM
.
Installation check 4/4: Relling the regenerative
Press lightly on the Easy Fill technology cover to
open it (see chapter 
19).
Add up to 30 kg of regenerative (regenerative
tablets in accordance with DIN EN 973 type A) to
the regenerative container. The maximum level

level of approx. 46 cm.
Caution:
Press the Easy Fill technology cover down gently
until it snaps shut.

Table of Contents

Related product manuals