6-WORKINGOPERATIONS
Movingthemachineforwardswhenworking
1.Itispossibletousethebackhoeattachmenttomove
themachineforwardatthesametimeastheexcava-
tion.
2.Makesurethatthefrontwheelsarestraight.
3.Settheenginespeedto1000RPM.
4.Releasetheparkingbrake.
5.Raisetheboomandretractthedipper,thenmove
theboomsoastoplacethebackhoebucketteeth
onstableground.
6.Raisethestabilizersandtheloaderbucketabout
20cm(7.87in)fromtheground.
7.Usetheboomanddippertomovethemachine.
8.Aftermovingthemachine,lowerthestabilizersand
placetheloaderbucketontheground,thenlevelthe
machine.
9.Engagetheparkingbrake.
NOTICE:Thisprocedurecanonlybeusedonlevel
ground.Neveruseitonslopingground.Onsloping
grounditismandatorytoturntheoperator’sseattothe
loaderattachmentpositiontomovethemachinebythe
normalprocedure.
Themachinecanbemovedsidewaysinthesamefash-
ion,exceptthatthebucketmustbeattosupportthe
weightofthemachine.Usetheswingcontroltomove
themachinesidewaystotherequiredposition.
PTIL14TLB0034AB1
6-18