EasyManua.ls Logo

Ciena 6200 - Page 176

Default Icon
256 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8-2 Network reconfiguration
6200 Packet-Optical Platform Installation, Commissioning, and Testing Procedures
Release 1.1 009-6200-201 Draft Issue 1
Copyright
©
2014 Ciena
®
Corporation September 2014
Procedure list
Table 8-1 lists the procedures that are described in this chapter
Table 8-1
Network reconfiguration procedures
Action Details
Adding an 6200 network element to a STM-1/OC-3 ring
configuration with 15G MRO XC circuit pack
Procedure 8-1
Adding an 6200 network element to a STM-4/OC-12 ring
configuration with 15G MRO XC circuit pack
Procedure 8-2
Adding an 6200 network element to a STM-16/OC-48 ring
configuration with 15G MRO XC circuit pack
Procedure 8-3
Adding an 6200 network element to a STM-64/OC-192 ring
configuration with 60G MRO XC circuit pack
Procedure 8-4
Deleting an 6200 network element from a STM-1/OC-3 ring
Configuration with 15G MRO XC circuit pack
Procedure 8-5
Deleting an 6200 network element from a STM-4/OC-12
ring Configuration with 15G MRO XC circuit pack
Procedure 8-6
Deleting an 6200 network element from a STM-16/OC-48
ring Configuration with 15G MRO XC circuit pack
Procedure 8-7
Deleting an 6200 network element from a STM-64/OC-192
ring Configuration with 60G MRO XC circuit pack
Procedure 8-8
Adding a 6200 node into a MS-SPRing/BLSR configuration Procedure 8-9
Deleting an 6200 node from a MS-SPRing/BLSR
configuration
Procedure 8-10

Table of Contents