EasyManua.ls Logo

CIM PRO COMBI 1000 - 7.1 PLANNED MAINTENANCE

CIM PRO COMBI 1000
113 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 MAINTENANCE
7-3
OPERATOR’S MANUAL PRO SERIES
7.1 PLANNED MAINTENANCE
This section describes the operations to be carried out
at regular intervals to ensure correct machine
functioning.
ATTENTION! THE MAINTENANCE
OPERATIONS DESCRIBED IN THIS SECTION
MUST BE CARRIED OUT RIGOROUSLY TO
ENSURE CORRECT FUNCTIONING AND
LONG LIFE FOR YOUR MACHINE.
ATTENTION! IF THE MAINTENANCE
OPERATIONS ARE NOT CARRIED
OUT IN ACCORDANCE WITH THE
INSTRUCTIONS PROVIDED,
MF GROUP srl IS NOT RESPONSIBLE
IN
ANY WAY FOR MACHINE PROBLEMS
AND MALFUNCTIONS.
The following table indicates the maintenance program
recommended by MF GROUP srl .
UNIT FREQUENZA
Loading unit lubrication each 100 hours
Trolley truck lubrication each 6 months
Cleaning of the clamping unit each 2 months
Cleaning of thermographic unit each 100 hours
Tipper lubrication each 20 days
ATTENTION! IT IS FORBIDDEN TO REMOVE THE
COVER AND THE PROTECTIONS PRESENT INSIDE
THE EMBOSSER.
Note: For cleaning and printing ribbon replacement see
section 5 RIBBON REPLACEMENT
AND
ADJUSTMENTS.

Table of Contents

Related product manuals