75
11.1.2 Charge First Mode
The order of priority for solar power usage will be Battery>Load>Grid. During the charge first period,
loads are first supplied power from the grid. If there is excess solar power after charging batteries, the
excess solar will power the loads along with grid power.
• Application Scenarios
When users want solar power to charge batteries and the grid is used to power loads.
• Related Settings:
Example
Solar power will be used to charge the
battery first. If there is extra power, it will be
used to take the load.