Checklist for Completed Installation
124
11.0 CHECKLIST FOR COMPLETED INSTALLATION
11.1 Moving and Placing Equipment
___ 1. Unpack and check received material.
___ 2. Proper clearance for service access has been maintained around the equipment.
___ 3. Equipment is level and mounting fasteners are tight.
___ 4. If the equipment has been disassembled for installation, unit must be reassembled per
instructions.
11.2 Electrical
___ 1. Supply voltage and phase matches equipment nameplate.
___ 2. Wiring connections completed between disconnect switch, evaporator unit and heat rejection
equipment.
___ 3. Power line circuit breakers or fuses have proper ratings for equipment installed.
___ 4. Control wiring connections completed between indoor evaporator and heat rejection
equipment.
___ 5. All internal and external high- and low-voltage wiring connections are tight.
___ 6. Confirm that unit is properly grounded to an earth ground.
___ 7. Control transformer setting matches incoming power.
___ 8. Electrical service conforms to national and local codes.
___ 9. Check blowers and compressors (scroll only) for proper rotation.
___ 10. Upflow units only: Field installed low volt wiring routed with loop to allow electric box to
swing.
___ 11. For units with variable speed drive (VSD) operating on Delta-connected power, ensure that
the EMC filter has been disconnected; see 8.1 - Variable Speed Drive for details.
___ 12. Check for loose electrical connections on steam generating humidifier. Confirm that electrode
plugs are pressed firmly onto the electrode pins.
11.3 Piping
___ 1. Piping completed to refrigerant or coolant loop (if required).
___ 2. Piping has been leak-checked, evacuated and charged (if required).
___ 3. Additional oil has been added for system charges over 40 pounds (18.1kg) per circuit (see
9.2.2 - Scroll and Digital Scroll—Additional Oil Requirements.
___ 4. Piping is properly sized, sloped and trapped as shown in the piping schematics
___ 5. Check piping inside and outside of equipment for proper supportand adequate spacing to
prevent rub-through.
___ 6. Ensure TXV equalizer lines and sensing bulb lines have sufficient clearance and do not rub
against other refrigerant lines.
___ 7. Ensure that factory clamps have been reinstalled.
___ 8. Drain line connected and pitched per local code.
___ 9. Water supply line connected to humidifier.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Emerson Liebert DS Series and is the answer not in the manual?

Emerson Liebert DS Series Specifications

General IconGeneral
BrandEmerson
ModelLiebert DS Series
CategoryHeat Pump
LanguageEnglish

Related product manuals