Checklist for Completed Installation
125
11.4 Other
___ 1. Ducting complete (if required), maintain access to filters.
___ 2. Filters installed.
___ 3. Check fasteners that secure compressors, reheats, humidifier and motors—some may have
become loose during shipment.
___ 4. Verify water detection is properly installed around all units (recommended).
___ 5. Control panel DIP switches are set based on user requirements.
___ 6. Blower drive system rotates freely and belts are properly aligned and tensioned.
___ 7. Compressor shipping blocks removed and springs adjusted (see 5.3 - Semi-Hermetic
Compressor Spring Isolation System).
___ 8. Remove rubber band from float in optional infrared humidifier.
___ 9. Seal openings around piping and electrical connections.
___ 10. Installation materials and tools have been removed from equipment (literature, shipping
materials, construction materials, tools, etc.).
___ 11. Locate blank startup sheet, ready for completion by installer or startup technician.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Emerson Liebert DS Series and is the answer not in the manual?

Emerson Liebert DS Series Specifications

General IconGeneral
BrandEmerson
ModelLiebert DS Series
CategoryHeat Pump
LanguageEnglish

Related product manuals