5 Conversion and maintenance
128 Festo – P.BE-MPA-EN – 1309f – English
Mounting
Proceed as follows:
1. Then proceed logically as described in the section 5.3. 7, under Mounting point 1 … 3.
2. Mount the proportional pressure regulator as described in the mounting instructions VMPA-…TA-... .
3. Mount the MPA-S valve terminal onto the mounting surface ( chapter 3, “Wall mounting” or
“H-rail mounting”).
4. Then install the pneumatic and electrical connections ( chapter 3).
5.5 De-commissioning and disposal
Observe the instructions on dismantling in chapter 3.
Disposal
Observe the local regulations for environmentally appropriate disposal of electronic mod-
ules.
The product is RoHS-compliant.