4 Commissioning
Festo – P.BE-MPA-E N – 1309f – English 83
4 Commissioning
4.1 Prior to commissioning 84.....................................................
4.1. 1 Pressure build-up in the overall supply 84................................
4.2 Manual override (MO) 86......................................................
4.3 Testing the valves and the valve/actuator combination 87............................
4.4 Mounting/removing the manual override cover cap (optional) 91......................
4.4.1 Mounting 91.......................................................
4.4.2 Dismounting 92.....................................................
4.5 LED display of the valves 93....................................................
4.5.1 MPA-S v alve terminal with CPX terminal or CPI connection 94.................
4.5.2 MPA-S v alve terminal with multi-pin plug connection or AS-interface 95........
4.6 Commissioning instructions for the proportional pressure regulator 95.................
4.7 Error handling 97............................................................
4.7.1 Impairment of functions 97............................................
4.7. 2 Operating statuses of the pneumatic system 98...........................