Seite/Page 34 Panda_5000i_PMS_eng.R01 - Kapitel/Chapter 3: Basics 9.12.10
Measure battery charge status based on open-circuit voltage.
During downtimes >7 days, disconnect battery (e.g. battery main switch to position 0).
Check the battery within 2 months and allow the engine to warm up for min. 10 min.
3.4.3 Measures for medium term downtimes / hibernation
Medium term downtimes (3 to 6 months)
3.4.3.1 Surface protection measures:
Check battery charge status and recharge regularly, roughly every 2 months, as necessary. Observe instructions
of the battery manufacturer.
Check cooling water anti-freeze level and refill as necessary.
The anti-freeze agent must not be older than 2 years. The anti-freeze content shall be between 40 % and 60 % to
ensure corrosion protection of the cooling water circuit. Refill coolant if necessary.
If the cooling water is drained, e.g. after engine surface protection is applied, no water may remain inside the
engine during the downtime. The control unit must be marked accordingly with a note specifying "NO COOLING
WATER".
Drain engine oil as specified. Refill engine with preservative oil to the max. level on the oil dipstick.
Drain diesel from tank and refill with a protective mixture (90 % diesel and 10 % preservative oil) (level to full).
Let engine warm up for 10 min.
Dismount V-belt as specified, wrap and store in a dry location. Protect against UV radiation.
Attention!
Cover alternator apertures.
Cleaning fluids and preservatives must not enter the
alternator. Risk of destroying the alternator.
Clean engine as per manufacturer's instructions.
Spray engine parts and V-belt disks with preservative.
Clean air filter housing and spray with preservative (metal housing only).
Close off intake and exhaust apertures (e.g. with tape or end caps).
Attention!
Before recommissioning, remove preservatives and protective
measures.
3.4.3.2 Measures for removing surface protection after medium term downtimes (3 to 6
months).
Check battery charge status and recharge if necessary. Observe instructions of the battery manufacturer.
Check cooling water anti-freeze level and cooling water level and refill as necessary.
Drain engine oil. Replace oil filter and engine oil as per the specification.
Remove preservatives from the engine with petroleum spirit.
Degrease V-belt disks and mount V-belt according to instructions. Check V-belt tension!
If applicable, open turbocharger oil pressure line and fill clean engine oil into channel.
Hold engine stop lever in zero delivery position and crank engine manually several times.