EasyManua.ls Logo

Fluke DSX-600 - Page 171

Fluke DSX-600
238 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 8: Use Projects
Tutorial: Make a New Project
153
The date range for the results in the project.
Results: A summary of the test results in the project:
: The number of tests that failed.
: The number of tests that passed.
: The number of results from tests on twisted pair cable that
have PASS* results. PASS* results have measurements within
the range of accuracy uncertainty for the tester. See “PASS*/
FAIL* Results” on page 94.
To see the results, tap the panel.
Test Setup: The tests that are necessary for each cable in the
project.
To add a test to the project, tap NEW TEST.
For information about twisted pair test settings, see Chapter 3.
Cable ID Sets: The sets of IDs the tester can use for the names of
test results.
To add a set of IDs to the project, tap NEW ID SET. See “How to
Make ID Sets” on page 165.
To use a different project, tap CHANGE PROJECT, then tap a
project.
To make a new project, tap CHANGE PROJECT, then tap NEW
PROJECT.
TRANSFER lets you export or import projects to or from a flash
drive, and delete projects on the flash drive. The project data
includes all project settings and test results.
MANAGE lets you rename, copy, or delete a project that is in the
tester:
Rename: Lets you give the project a new name. The tester
saves all the settings and test results in the project with
the new name.

Table of Contents

Related product manuals