EasyManua.ls Logo

Fluke DSX-600 - Step 1: Give the Project a Name; Step 2: Specify an Operator

Fluke DSX-600
238 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DSX-600 CableAnalyzer
Technical Reference Handbook
154
Copy: Lets you use the settings in the project to start a
new project. The tester does not put test results into the
new project.
Delete: Lets you delete the project and all the test results
in the project. The tester shows a warning if you have
uploaded less than 100% of the results to a PC.
To delete the test setup or ID set, tap . To copy the test setup
or ID set so you can edit it to make a new one, tap .
Notes
If you delete an imported ID set from a project,
the ID set is still available in the tester. To delete
imported ID sets from the tester, use LinkWare PC
software. See “Delete an Imported ID Set” on
page 169.
A project must have at least one Test Setup and
one Cable ID set. If you delete them all, the tester
makes a default Test Setup and Cable ID set.
Step 1: Give the Project a Name
1-1 On the home screen, tap the PROJECT panel. The PROJECT
screen shows the active project.
1-2. Tap CHANGE PROJECT, then tap NEW PROJECT.
1-3. Use the keyboard to enter a name for the project, then tap
DONE.
Step 2: Specify an Operator
The operator is the person who will use the project to do a job.
2-1 On the PROJECT screen, tap the Operator panel, then select
or add an operator:
To select a different operator, then tap a name in the
OPERATOR list.
To add an operator to the list, tap NEW OPERATOR, use
the keyboard to enter a name.

Table of Contents

Related product manuals