EasyManua.ls Logo

Fluke DSX-600 - Step 3: Set up Tests for the Project

Fluke DSX-600
238 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 8: Use Projects
Tutorial: Make a New Project
155
2-2. Optional: Enter the email address that the operator will use as
an ID to sign in to LinkWare Live.
2-3. When you are finished, tap DONE.
2-4. To go back to the PROJECT screen, tap the name of the
operator you want to use.
Step 3: Set up Tests for the Project
A project includes the tests and settings for the tests that are
necessary for a job. If you do not specify settings for a test, the
tester uses the default settings.
For this tutorial, your project will include tests for twisted pair
cable.
To set up a twisted pair test for the project
3-1 On the PROJECT screen, tap NEW TEST.
3-2. On the TEST SETUP screen, select and change the test settings
as necessary for a test on twisted pair cable. For information
about twisted pair test settings, see “Settings for Twisted Pair
Tests” on page 82.
3-3. When you have completed your selections for the twisted pair
cable test, tap SAVE on the TEST SETUP screen.
(continued)

Table of Contents

Related product manuals