EasyManua.ls Logo

Fujitsu ETERNUS CS800 S6 - Storage Expansion - Scale

Fujitsu ETERNUS CS800 S6
561 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17.2 Storage Expansion - Scale
7. Turn on both PSU switches on the rear side of each storage module.
8. If the ETERNUS CS800 S6 was shut down prior to adding the new hardware, turn on the
server by pressing its power ON/OFF button now.
Otherwise, if the system was operable while the new disks were added, initiate a
reboot via the remote management pages (see "Reboot & Shutdown" on page 430).
9. Wait at least 15 minutes before starting any further actions. The integration of the
added disks takes place automatically, no further actions are required.
17.2 Storage Expansion - Scale
Table below shows the numbering schemes for the storage array(s). Figure below shows
the recommended mounting positions of the modules in the rack.
Storage Modules Denotation
DX100 S3 base CE
1 DX100 S3 expansion module on the DX100 S3 base DE-1
2 DX100 S3 expansion module on the DX100 S3 base DE-2
3 DX100 S3 expansion module on the DX100 S3 base DE-3
... ...
10th DX100 S3 expansion module on the DX100 S3 base DE-a
Table 29: Numbering of the Storage Modules for a Scale System
Figure 324: Recommended Positions of the Modules in the Rack for Scale
ETERNUS CS800 456

Table of Contents

Other manuals for Fujitsu ETERNUS CS800 S6

Related product manuals