CHAPTER 3
Small Configuration
Installing the LAM/DCM Shelf (SDL1)
FNC-7500-0061-200
Issue 1, May 2009
FLASHWAVE 7500 Release 6.1
Equipment Installation
3-80
Fujitsu and Fujitsu Customer Use Only
4 Identify the flange mounting holes for Small rack installation on the side of the SDL1 shelf.
See Figure 3-68 [p. 3-80].
5 Using four pan-head Phillips M4 screws (8 mm long) on each side, secure the shelf flanges to
the SDL1 shelf as shown in Figure 3-41 [p. 3-57].
Figure 3-68: Flange Mounting Holes on Right Side of SDL1 Shelf (Small Rack Installation)