CHAPTER 4
ETSI Configuration
Installing the ETSI DCM (SFD6) Shelf
FNC-7500-0061-200
Issue 1, May 2009
FLASHWAVE 7500 Release 6.1
Equipment Installation
4-32
Fujitsu and Fujitsu Customer Use Only
Install the SFD6 shelf as follows:
Step Task
1 Unpack the SFD6 shelf from the shipping container. The DCM units do not need to be
removed from the DCM shelf if they are already installed. The shelf can hold up to two DCM
units.
2 Get the flange kit for ETSI rack mounting (FC9682FLGD).
Figure 4-15: SFD6 Shelf Mounting in ETSI Rack
Top View of ETSI Shelf
Top View of ETSI Shelf
Installed in ETSI Rack
ETSI Rack
Left Shelf
Flange
Right Shelf
Flange
m1718py_1
Revision 1, June 2009